Reports

2010

McLoughlin Point

October 2010

Land Suitability Reports

Westland Resource Group prepared two reports in October 2010 for the CRD on land suitability for a biosolids energy centre and for attenuation tanks in Saanich East.

July 2010

Esquimalt Public Open House Sessions

In July the CRD held two open houses in Esquimalt to educate residents and receive feedback on the McLoughlin Option. Read the Public Consultation Summary Report. (PDF PDF)

Household Organics Management Report

Read the Household Organics Management Report (PDF PDF), published in July 2010, which drafts a plan for organics management and collection in the Capital Region.

Environmental Impact Study Report

The EIS Report describes the environmental effects of the construction and operation of the facilities at McLoughlin Point and Hartland Landfill including wildlife and wildlife habitat, traffic, noise visual aesthetics, and other effects. The EIS identifies potential impacts of the treatment facilities and ancillary facilities, and recommends mitigation measures as appropriate. EIS Report on McLoughlin Point and Hartland Landfill (PDF PDF).

April 2010

An open house and validation session were held on April 20 and May 12 in Saanich East. The CRD gathered input on a possible adjustment of the Saanich East facility to the Saanich owned portion of the Finnerty-Arbutus property. A report on the consultation is due in June 2010.

Public Consultation Summary Report, Saanich East (PDF PDF)

February 2010

Procurement Public Consultation Report

In February the CRD held two open houses and a workshop on proposed procurement options for the Core Area Wastewater Project. These sessions provided an opportunity for the public and stakeholders to give feedback on proposed procurement models, via comment forms and discussions with staff. Read the Report on Consultation (PDF PDF).

West Shore Siting Consultation Report

On January 26th and 28th 2010, CRD held two siting open houses in Langford and Colwood. The open houses provided an update on the wastewater treatment project, opportunity for West Shore residents to discuss the Program with staff and local representatives and give feedback via comment forms. Read the Report on Consultation (PDF PDF) .

2009

Macaulay Point

December 2009

Option One: Wastewater Treatment Program Amendment Report

Stantec Consulting prepared a Report on Option 1A, the chosen wastewater program for the Core Area.

November 2009

Biosolids Management Plan

This report presents a biosolids management plan for the Core Area Liquid Waste Treatment project. It was finalized in November 2009.

Public Education Summary Report for Esquimalt & Victoria

This report presents a summary of the public education sessions that took place in Esquimalt and Victoria in October 2009, including a summary of written responses to a survey.

Site Identification & Evaluation Update

An update was provided to the Core Area Liquid Waste Management Committee (CALWMC) with an update on the treatment plant site identification and evaluation project and to seek approval of the site selection criteria.

September 2009

Core Area Assessment of Wastewater Treatment Options 1A, B & C

Core Area Wastewater Treatment Assessment of Wastewater Treatment Options 1A, 1B and 1C, Volume 1. This report, prepared by Stantec Consulting Ltd., presents a Triple Bottom Line analysis of the Options 1A, 1B and 1C. These options were created by the Peer Review Team for wastewater treatment facilities in the Region's Core Area.

July 2009

Saanich East-North Oak Bay (SENOB) Siting Reports

Several reports were published regarding siting of a wastewater facility in SENOB. The reports include a Comparative Environmental and Social Review, a Public Consultation Summary Report for SENOB, a Triple Bottom Line Analysis of Candidate Sites and a Wastewater Update Newsletter, sent out to residents in August 2009.

June 2009

Progress Report to the Minister of Environment

A progress report on the wastewater project was submitted to the Minister of Environment on June 30, 2009. The report includes a Letter to the Minister, a summary report and several appendices, which can all be found in the Document Archive, under Reports. The appendices include the Peer Review Team Final Report and the Public Consultation Summary Report.

March 2009

Environmental Impact Assessment

This Stage 1 Environmental Impact Study (EIS) examines the effluent discharge from two proposed new wastewater treatment plants proposed by the CRD in Saanich East/North Oak Bay and the West Shore areas. The EIS framework provides an appropriate approach to pre-discharge evaluation, assessing the impact of the proposed secondary effluent through modeled flow scenarios.

2008

Dallas Road in late spring

December 2008

A progress report on the wastewater project was submitted to the Minister of Environment in December 2008. The report includes a Letter to the Minister and several appendices, which can be found in the Document Archive, under Reports. Appendix C and D of the Report are comprised of the 2008 Discussion Papers. Summaries of these papers can be found on the Current Research page; full versions can be found in the Document Archive.

June 2008

Core Area Wastewater Management Program Development Phase Report

The CRD received a deadline extension for submission of the Amendment to the Core Area Liquid Waste Management plan by 12 months. The new deadline is December 31, 2009. Project completion will continue to be scheduled for 2016.

The request for an extension was submitted with the Core Area Wastewater Management Program Development Phase Report to the Environment Minster Barry Penner along with a letter.

The report includes an overview of the progress made up to June 1, 2008, a response to the minister’s request for a plan for meeting the six wastewater objectives and a revised schedule for completion of the Program Development Phase of wastewater treatment.

Business Case Market Sounding

Business Case Market Sounding & Stakeholder Consultation (PDF PDF)
This report presented the results of the business case market sounding and consultation work completed by Ernst & Young Orenda Corporate Finance Inc. (Ernst & Young) as part of its contract for the provision of business advisory services for the Core Area and West Shore Wastewater Treatment program.

May 2008

Conceptual Planning Phase Activity Update

Core Area Wastewater Program Conceptual Planning Phase Update (PDF PDF)
The conceptual planning phase of wastewater treatment is currently underway in eight technical activitiy areas. The following powerpoint presentation is an update on these activites as of May 7, 2008.

Research into New Technologies

Investigation of Examples of Integrated Resource Management in Sweden (PDF PDF)
Representatives from the Province, Victoria, the CRD and a consulting engineer recently returned from a trip to Sweden, to investigate resource recovery methods in wastewater treatment and their possible application to planning for treatment in the Capital Region. The fact finding mission involved three Swedish locations: Göteborg, Stockholm and Västerås.

January 2008

Planning & Engineering General Scope

Planning and Engineering General Scope (PDF PDF)
To further refine the strategy adopted by the CRD Board in June 2007 and to develop the responses required by the minister of environment, conceptual level engineering planning will be undertaken through eight activities.

Core Area Liquid Waste Management Committee

Staff Report (PDF PDF)
Enclosed in this staff report is an outline of the work needed to respond to the Minister's letter & requirements for wastewater management in the Core Area municipalities of Colwood, Esquimalt, Langford, Oak Bay, Saanich, Victoria and View Royal.

2007

Western Communities, Albert Head

 

 

 

 

June 2007

Report to the Minister of Environment: Amending the Core Area Liquid Waste Management Plan

On July 21, 2006, the provincial minister of environment directed the CRD to submit an amendment to the Core Area Liquid Waste Management Plan detailing a fixed schedule for sewage treatment in the Core Area. The amendment, which provides a strategy, cost and schedule for wastewater treatment, was submitted to Minister Barry Penner on June 29, 2007.

The CRD's Amendment Report also included the following documents:

The Path Forward: Wastewater Treatment Strategy

In this report, a team of engineering experts identified six conceptual areas for wastewater treatment facilities as well as a biosolids processing site. Following the approval of the report, a professional team led by Westland Resource Group Inc. was retained to:

  • identify the best locations for treatment facilities
  • assess potential environmental and social impacts of facility construction and operation
  • recommend mitigation measures to avoid or reduce identified impacts
  • communicate these findings to the public

2006

Macaulay Point

December 2006

Interim Progress Report (PDF PDF)
An Interim Progress Report to the Minister of Environment, Barry Penner, was submitted on December 31, 2006. The report detailed a fixed schedule for the provision of wastewater treatment by June 30, 2007.

July 2006

Scientific and Technical Review of the CRD's Core Area Liquid Waste Management Plan (PDF PDF)
An independent Scientific and Technical Review Panel reviewed over 200 scientific and technical reports and recieved 82 written submission from the public through a seven week call for technical information. The Society of Environmental Toxicology and Chemistry (SETAC) selected the panel and provided administrative support.